Live Procurement Careers SCAPE Scotland Contact

Case Studies Overview

Take a look at the different types of projects our frameworks have accelerated
 

Filter case studies

Frameworks
Project Sectors
Partners
Locations
Oak House Completion Image 1

Construction frameworks

Oak House Council Offices

Bringing Nottinghamshire County Council's key services together under one roof, the Oak House development provides a modern civic hub.
Sea change Construction Case Study v3 10 1

Civil Engineering frameworks

Portsmouth Sea Change

The £8m pioneering Portsmouth Sea Change scheme delivers critical shore power infrastructure across the port’s busiest berths, supporting the transition to Net Zero maritime operations.
Brent Completion Image

Construction frameworks

Expanding specialist education in Brent

Creating an additional 48 specialist education places for Brent children with concurrent expansions at Preston Park Primary School, Newman Catholic College and St Margaret Clitherow RC Primary School.
Willmott Dixon AMU Brighton interior corridor

Construction frameworks

Royal Sussex Hospital Acute Medical Unit

Expansion and refurbishment of the Acute Medical Unit (AMU) at the Royal Sussex County Hospital in Brighton.
Thorp Completion Image resized

Thorp Academy

The £5.6m extension at Thorp Academy has created a modern learning environment designed to accommodate the growing local student population and support the academy’s future growth.
Ty Darran exterior 1

Construction frameworks

Ty Darran Later Living Scheme

Establishing a blueprint for council-developed later living accommodation, the Ty Darran Later Living Scheme has created 45 high-quality apartments for residents aged 60 and over in Caerphilly.
Paddock exterior with signage

Construction frameworks

Paddock SEND School

Paddock Secondary and Sixth Form School in Tooting is a new, purpose-built, net-zero in operation school that has created 64 additional SEND pupil places.
Yorkshire Armley Gyratoy Balfour Beatty 1 1

Civil Engineering frameworks

Armley Gyratory

A multi-million-pound scheme that has improved routes for pedestrians and cyclists negotiating one of Leeds’ busiest junctions.
London National Maritime Museum Willmott Dixon 2 1

Construction frameworks

National Maritime Museum

Improving the existing central space within the Grade I listed building, Wilmott Dixon Interiors breathed new life into the Ocean Court building at the world-famous museum.
Accrington Completion Image resized for web

Construction frameworks

Accrington Square Market

Transforming three prominent town centre buildings, including the Grade II-listed Market Hall, Burton's Chambers and Market Chambers.
Santon Downham equipment storage structure

Construction frameworks

Santon Downham Forestry Commission

R G Carter's Santon Downham project has delivered a lasting contribution to society by modernising Forestry England’s operational infrastructure and creating a sustainable foundation for future growth.
Exterior view of Ravenshead Leisure Centre G F Tomlinson

Construction frameworks

Ravenshead Leisure Centre

Delivered for Arc Partnership, a joint venture between Nottinghamshire County Council and SCAPE, alongside Ravenshead Parish Council, by G F Tomlinson, the Ravenshead Leisure Centre refurbishment has revitalised a vital community hub...